Bilal Prayer Hall at Samburu Secondary School; Prgress Report 2 - November 2009 Print E-mail

Progress Report (2) – November 2009
Project: Bilal Prayer Hall at Samburu Secondary School

Observations of the Construction in Progress

 Image Image
 Roofing sheets almost placed Roof with truss

1. The four walls of the building have been erected.
2.  The ring beam has been casted all round the wall.
3.  The wall has been further raised above the ring beam.
4.  Partition wall of the prayer hall and wudhoo area has been erected to the roof level
     between male and female section.

 Image5.  Electrical Conduiting work is completed.
6.  Mains connection for power of two fuses has been fitted at back side of the male prayer hall.
7.  Arched ventilation at the entrance has been casted.
8.  Arch at the entrance halls is already in place.
9.  Internal walls and partition walls have been plastered.
10. Roofing under progress.
 Electrical conduits & mains


November 2009   

 
< Prev   Next >