Renovation Progress Report - April 2009 (5) |
|
|
|
Centre: Mackinnon Road Project Masjid Refurbishment / Extension, Construction of Four Classrooms and Muallim House Masjid: 1. External block works done. 2. New windows placed in respective positions. 3. Roofing sheets were placed on steel trusses and gables in the prayer hall and verandah. 4. Plastering of walls both externally and internally in progress.
|
| MAIN ENTRANCE | SIDE VIEW |  |  | VERANDAH AREA | INTERIOR AREA | Classrooms: 1. Vents already placed in the front of the rooms at the entrances. 2. Placing of tiles on the window sills externally was in progress. 3. The floor with red oxide done. 4. Block work with plaster of the inbuilt cupboards was done.
|
|  | BACK VIEW | FRONT VIEW | INTERIOR AREA | Muallim House: 1. Placing of tiles on the window sills externally already done. 2. Vents were put at their respective places. 3. Paving slabs 600 mm x 600 mm placed all round. 4. The floor with red oxide done. 5. Toilet pit wall and slab over a 4.5 m/15 ft pit already constructed. 6. Construction of latrine/bath walls was in progress.  |  | INTERIOR VIEW | EXTERIOR VIEW |
| BATH / PIT LATRINE |
Ventilation Improved Pit Latrine: 1. Toilet pit wall and slab over a 4.5 m/15 ft pit already constructed. 2. Construction of latrine walls for 4 cubicles was in progress.
| COMMON PIT LATRINE |
April, 2009 |