Construction / Renovation Progress Report; June 2008 Print E-mail

Construction / Renovation Progress Report
Moyeni Centre - June 2008

Project: Masjid, Four Classrooms and Muallim House

Masjid :

• All RC Columns have been erected upto beam level.
• The RC Ring beams to the perimeter wall of the Masjid have been casted.
• The party walls partitioning the gents and ladies prayer hall, verandah and ablution area have been built.
• RC slab has been casted in the ablution area, including the water drainage channel. 
• The walling to the gable ends above the ring beam has been built.
• The shuttering of the RC beam is in progress.

Image Image Image

Classrooms :

• Columns of the entire block have been erected. 
• Walling to the structure has been built including the gable ends above the beam.
• The RC beam to the perimeter walling of the classroom have been casted.

 Image Image Image

Muallim House:

• The ground floor slab has been casted.
• Termite Treatment has been made.
• The walling to the entire building structure including the gable ends has been built.
• The ring beam to the perimeter wall and lintels to the internal openings have been casted.
• The Muallim house building structure is ready for roof fixing.

Image Image Image

 